Horizontal directional drilling technology

Horizontal directional drilling technology
Using horizontal directional drilling crossing technology in pipeline crossing construction, digging the ground, can through the highway, railway, river, or even can pass under the buildings, is a kind of can safely and effectively for the construction method of environmental protection. Especially in environmental protection, municipal pipeline network reconstruction project and large pipeline crossing river engineering more show its unique advantage.
The working process of the horizontal directional drilling crossing technology is guide through the computer control and detection, to drill a pilot hole, the same as the design curve then guide hole enlargement, pull the product pipeline back to expand the pilot hole, with the construction process of pipeline crossing.Horizontal directional drilling and trenchless technology has been widely used in foreign countries, and also gradually spread in the country.1 horizontal directional drilling crossing construction technology for pipeline crossing using horizontal directional drilling construction, generally divided into two steps: the first step is to accurately as possible in accordance with the design curve of drill a pilot hole;The second step is to guide hole reaming, and the product line (typically, MPP, PVC pipes, PE cable casing, pipe, pipe, etc.) along the guide hole back to expand the pilot hole, the pipeline crossing work done.1.1 guide hole guide hole drilling is the key of the directional drilling, guide device adopt wireless or wired positioning system to determine the control to the scheme, mud and driller must pay attention to each link, the careful analysis of various parameters, cooperate with each other accords with a requirement to drill a pilot hole, drill pilot hole to contrast analysis of geological data and instrument parameters into a hole at any time, and always be each drill pipe guide hole record (thrust size, guide hole size, torque, etc.) to the difficulty of the operator to pay close attention to the change of pump pressure, torque, thrust.1.2 preliminary reaming after the completion of the guide hole, the drilling to expand to the appropriate diameter for finished product pipeline installation, this process is called reaming, usually, on the other side drill reamer is connected to the pipe, and then by the drill rotating dragged back into the guide hole, the guide hole enlargement, to a large number of mud pump into the hole at the same time, to ensure the integrity of drilling and not collapsed, and will be cutting the cuttings back to the ground.Guide hole completion, to unload in time after bit unearthed, fitted with a reamer for reaming.According to the geological condition and pipe diameter grading reaming, finally aperture D = 1.2 1.3 Dn (Dn for pipeline diameter).Reaming, adjust appropriately according to the design requirements when the mud displacement control back to the drag speed, smooth bore hole reaming in accordance with the design parameters, the operator to pay close attention to the pump pressure, the change of the torque and drag back, it is strictly prohibited to suppress pump, suppress drill, forced back to enlarge.Analysis, after the completion of reaming hole formation, again with a reamer hole cleaning when necessary.1.3 back to drag pipes bore hole has been completed, the finished pipe into the borehole.Piping prefabrication should be completed in the side opposite the rig.Reamer drill pipe at the other end is connected at one end by rotary joints from finished product line.Rotary joint can avoid product pipeline with reamer rotating, so as to ensure its smooth into the hole.Dragged back completed by drilling, this process also requires a lot of mud to cooperate, to drag process should be continued until the reamer and finished product pipeline from one side drill ground.2 the characteristics of the horizontal directional drilling construction 1) directional drilling crossing construction has not blocking traffic, won’t destroy green land, vegetation, will not affect people’s normal life and work order, solve the traditional excavation construction interference impact on the residents’ life.GN decanter centrifuge

GN Mud tank

Mud tank can configure different dimension according to the customer’s demand. Mud tank is in the oil, gas, and salt in the process of drilling operation of geology and mineral resources of essential equipment.

GN MUD TANK
Mud tank is a purification plant equipment, made up of tank, mud tank, mud mixer, slurry tank is installed on top of tank, stirrer installed on the roof, the tanks by the isolation plate divided into two parts, the feature is that there are two vertical sand pump installed on the roof and the desander, desilter, sand pump export respectively through pipeline and desander, desilter import connected, sand pump and motor coupling.
Connectivity issues about mud tank: there are flange for tank connection (inflatable joints connecting sealing, pressure sealing packing connection), coupling connection type, etc. There is no big problem for external connection and sealing, mud tank is mainly consider for moving convenient installation. At present, a lot of tank with built-in pipe, so that the main problem is that the built-in pipeline corrosion and the structure of the valve, so a good tank valve design is the key, to maintain a clean and tidy tank surface anti-skid drop off again to ensure that the operation is convenient and reliable. And all the valves should have reliable switch position indicator and easy to maintain. Electrical equipment installation specification, reasonable appliance is easy to operate simple, for medium voltage line and medium pressure valve separately color logo and so on. Protective water proof design according to need, but to ensure that the ventilation.

In China or overseas for Mud tank, in order to adapt to mountains, rivers, roads, etc. Through the engineering design, development, create a “horizontal directional crossing machine mud mixed recycling system”.Through the mud tank purification drilling fluid, recycling can greatly improve the level crossing rate, reduce the mud pump, drill pipe, drill bit wear, save materials, reduce drilling cost, protecting the environment, mud tank brought considerable economic benefits for the user.

GN shale shaker in USA

GN obtained the customer high praise, and in May on the oil and natural gas mining contractors website published articles about our equipment performance, editor is Ken westcott (Ken Wysocky). GN can sieve obtained the customer high praise, and in May on the oil and natural gas mining contractors website published articles about our equipment performance, editor is Ken westcott (Ken Wysocky).

GN USA shale shaker
The title of the article is: the vibrating screen equipment to help California contractor stay ahead in the industry of the fast pace of oil field.
http://www.gomcmag.com/editorial/2016/05/no_slacking_allowed
“Matt reyes, everytime his solid control equipment to a drilling site the risks are high, the bottom line is: keep pace or to give way to other suppliers can, our solution is GN America four screen of drilling fluid shale shaker.
In the oil field industry, oil field service companies, especially those who provide services and dehydration of solids control equipment company, a good name for business; And more importantly your equipment as well as your reputation. If your equipment is broken, the drilling companies in also won’t give you a call.
“CGE with solid control and dehydration services for a variety of industries, including oil drilling companies. Reyes said that the company can buy GN shale shaker for the first time was a year ago. At that time the main appeal is its competitive price. But reyes soon discovered that the machine performance is very good, this also explains why CGE has ten of the champions league to equipment now – or occupy half of its share of the shale shaker, he points out.”
When considering started investing in GN shale shaker, is the price to attract the customers, and finally, customers can found shale shaker can achieve performance requirements of the regulations, prompting the customer from the champions league can buy more equipment.
“Performance of the key factors is that the liquid flow rate and the G force on the screen; the liquid flow rate and the higher G force, can be and the higher the rate of per hour. GN can quadruple sieve sieve showed capacity is 140 per hour, exciting force can reach 8.0 G, equipment performance is of vital importance in both areas, reyes said. Many companies, said they would give you so much G force value, but when you do the motion analysis, it almost can not meet the requirements,” he said.But the GN can make it equipment.”
This customer has a GN shale shaker and mud cleaner; Mud cleaner with the shale shaker has the same design for drilling cuttings from the cyclone separation of dry. Sieve frame integral heat treatment to make it have enough strength to run on 7.5-8 g force. Horizontal beam welding in the strength of the side walls strengthened the screen again. Four pieces of screen mesh by 8 wedge firmly fixed on the bottom frame. Bottom frame is made of stainless steel has better antiseptic function.2.73 square meters of GN can sieve screen area made 140 M3 capacity, when using the API 40 mesh screen. Users can according to need to use the corresponding mesh screen, depending on their drilling how much sand, clay and other materials.
“Overall, reyes said that to buy GN equipment is a successful investment. Reyes said:” you need to recover the cost. Do you know? And they did it. According to the use, we sometimes run a device for six months, almost can earn back the cost. After that is profit.”
GN in its reliability picked up praise; The first device to sell to this customer 24 hours of continuous operation for 3 months, without any problems. Contractors want to make a profit in the fierce competition, GN manufacturing high ratio of solids control equipment and drilling waste disposal equipment is a good choice.

GN Typical Decanter Centrifuge Shown on Iran Oil Show

The particular 20th Iran Oil Present wan held on May 5-8 in Tehran Iran as well as GN Solids showed generally there the won designed typical decanter centrifuge of product GNLW363CG. Being as a principal oil exporting country, Iran’s oil show attracted readers from Middle East, To the north Africa and CIS places.
GN Solids will not miss almost any opportunity to show herself any kind of time valuable exhibition. A certain level of activeness will make people maintain GN in mind, which will be great for GN’s business in the world industry. GN is known as a professional supplier for drilling fluids solids control and drilling waste management equipment. Absolutely, the squander decanter centrifuge would be among GN’s featured products which might be promoted on the show.
gn centrifuge at iran oil show
GNLW363CG is one of GN’s basic decanter centrifuge model. The following below are few features of this particular model.
1 . Designed standard working speed up to 3200 rpm for ultra excellent solids separation. With 14” bowl diameter and span nearly 3 times of dish diameter; the treated substance would stay inside the centrifuge for longer time and solids discharged much dryer.
2 . not Bowl material is De dos pisos stainless steel 2205 much better than SS316L. The centrifugal casting engineering applied for better dynamic stability performance, which is the warranty for high speed.
3. Identical direction on slurry giving and solids moving into the bowl speeds up the circulation inside the bowl what enhances the treating capacity.
4. Changing speed control panel obtainable makes the centrifuge could be found in drilling mud cleaning system for barite recovery, squander cuttings management system along with dewatering system.

Many visitors found GN’s booth and learn more details on what GN can do and GN’s equipment works. Basically, GN already had clients who do drilling waste management job for drilling company. Overall nearly 30 unit decanter centrifuge were ordered this also quantity will keep increasing at a later date as GN’s decanter centrifuge is more and more popular in this region and the performance is proven positively on site degree.

The influence of drilling mud in the drilling process and control method

Mud system is one of the important equipment in oil drilling equipment, in the current global requirements for drilling technology and drilling cuttings under the basis of increasingly improve the quality of the mud purification directly determines the quality and cost of drilling, high quality mud solid control system plays a decisive role in the process of drilling.\

mud system 0618
Our company , GN Solids Control drilling mud solids control system processing mainly for four level solid control and five level purification. Level 4 solid control is the shale shaker, desander, desilter and decanter centrifuge processing, in addition to configure a set of vacuum degasser to five level purification treatment of mud, processing after the completion of the mud solid particles diameter control in 2-5 micron. Processed the proper configuration, drilling fluid and to ensure that the drilling fluid parameters such as viscosity, density of recycled into the drill after using, it is not only protection of the environment but also greatly saves the drilling cost.
Depending on the medium during the drilling process, drilling cuttings and drilling mud is different also, it can be divided into water-based mud, oil-based mud and mud of the emulsion. GN Solids Control can design according to the needs of different drilling mud solid control system, it will be fast, high-quality, efficient mud purification treatment and recycling. our company developed fourth generation D version of drilling cuttings dryer GNCD930D, unique design can be used in oil drilling cuttings OBM and composite drilling cuttings SBM, can also be used in water base drilling cuttings WBM dry processing. GN type D dryer, speed up to 1200 RPM, separation factors is as high as 750 g. Has successively applied to oilfield, shengli oilfield, and other project, has got customer’s consistent high praise.

ZJ 50 Mud system for a Indian drilling company

In 7th June, GN solids control complete a set of mud system for a Indian drilling company ZJ50 rig , successfully completed the whole series of mud system and past commissioning test, and make the delivery. Even though oil equipment manufacturing industry is so bad, we can get the order, with our previous experience on providing customers with quality products, fast, high-quality services and high quality price. The customer said” buy GN solids’s products, we don’t need worry about it”.
India GN solids

This set of solids control system in the process of production, installation, the equipment in strict accordance with the design specification requirements, the selection of national standard material, the brand of steel, and international well-known explosion-proof electrical components, after the completion of the system, customer field testing, very satisfied after acceptance, the champions league to solid control for Indian customers to provide the installation instructions and system maintenance of subsequent late, such as a full range of services, believe that the future continued cooperation will be very happy.
since the date of establishment of GN solids control, GN has been working on the solid control system and the solids control equipment research and development, production, provides the solid control system for many customers turnkey projects, and with the domestic several big drill rig factory facilities, are exported to more than 60 countries and regions, many owners in the global market of high-quality customers, for the champions league to the stable development of the solid control bring a steady stream of orders, GN solids control according to customer demand customize various configuration of mud system, can meet the needs of different drilling rig mud treatment.
With many cases, high quality products, excellent service and price, advanced production technology and manufacturing equipment, excellent management team and other advantages, is your reason for choosing GN.
GN solids control, You worth it!

GN Dewatering unit

GN solids control strong control flocculation and dewatering system , mainly made from: a set of 2000 l/hourly dosage flocculation system, a driling fluid centrifuge dehydration, a couple sets of dry filter, pumps and so on, is for often the mud cleaning system inside the mud does not be given birth to do better.
Equipment types, techie parameters:
This system might be preparation and adding the 2 kinds of Polymer drug as well, one set of LR – 2050 – s automatic powder snow preparation of flocculant and also dosing device, is used in order to automatically powder mixture zero. 05% – 0. five per cent of the Polymer solution, in addition to through the two dosing pump for added to the PAM adding medicament. Another list of liquid flocculating agent planning and dosing device the actual newly-modified LSY – 2100 l, through solution concoction stirring device, can position the liquid or solid Polymer bonded diluted or diluted, definitely not by two dosing penis pumps dosing PAC adding medication, medicinal drug, medicine.

141024-dewatering-unit-process
System composition and the boundaries are as follows:
1, PAM automatic preparation system along with working principle of the brief description:
Operators in the process of programmed dispensing, add the thérapeutique to the ethephon preparation while using container, after starting system, reagent are mixed with normal water after the first into the mixing soluble medicine cabinet, along with through the mud agitator here entirely stirring and mixing; Soon after dissolving medicine cabinet packed with own to push flow to heal medicine cabinet, and here yet again, stirring and mixing; Right after curing soluble medicine using and push themselves for you to soluble medicine storage container. When configured solution may be through the dosing pump to the dosing point.
2, PAM powder preparation and how functions:
PAM powder preparation unit main body of SUS304 stainless-steel materials. The device is broken into three, namely, preparation, maturing and storage of a few parts, and its size the actual flocculant curing time. The particular grid connection should produce not curing liquid doesn’t enter the batching. Each circumstance has a vent pipe along with control valves.
In the installing of electric mud agitator, the whole length and mixing section with regard to SS304 stainless steel material,
Inside preparation of the upper setting up 1 powder feeding device, the equipment including accurately complement the necessary parts, such as the give food to hopper, batching spiral, mixer, etc .

GN high G shale shaker and decanter centrifuge used in drilling waste management will replace the mud pit

In 2015, China implemented the most stringent environmental law, does not allow direct emissions, waste mud buried, not at the scene of the drilling mud pit was realized. Waste mud before direct emissions to the mud pit, and then directly buried, but these drilling waste to the surrounding environment and ground water pollution is very serious, causing damage to surrounding area environment. No mud pit this request must be equipped with drilling waste management system, used for processing waste mud. Frankly, from the vibrating screen, desander, desilter and mud cleaner exhaust waste mud will be transported to the waste disposal system. Finally finish the liquid will be reused to the solid control system, to have solid TDC mud machine factory for final processing. Recently, the company completed the Chinese petrochemical used to deal with the waste of a larger project, a total of 16 sets of high g vibrating screen and 8 sets of high speed centrifuge at the scene of the homework. As the first phase of the machine and high g vibration to the vibrating screen from the solid control system, directly to the desander, desilter and mud cleaner discharge of waste mud moisture content is reduced by 10%, high g vibration is usually suitable for water-based mud;Oil-base mud, selection of drilling cuttings dryer. After liquid pumping mud centrifuge for processing. Designed the GN high-speed centrifuges at 3200 RPM, to remove small solid particles of 2 to 5 microns.After centrifuge treatment, mud tank cleaning liquid will flow to the solid control system to use;Solid will be had to the TDC mud machine factory for processing.

GN Solids Control mud treatment equipment for sale

GN Solids Control have some pots of solids control mud treatment equipment in investment for sale. we stock the key equipment to fast supply and easier management so as to support the market in far better way. For now, we have a few batches of shear pump, centrifugal pump, shear pump, shale shaker, mud agitator, and decanter centrifuge in stock. If you need a few items urgent, pls make contact with GN Solids Control or maybe GN Solids America unhampered to get immediately response help support.

1) Centrifugal pumps, agitators, slurry pump in commodity for urgent project
All of us already sign agreement with all the supplier of the main areas (coupling, bearing, gearbox, etc) for centrifugal pumps, mud agitators, slurry pump etc . In cases like this, the supply period of the main elements can be reduced. Thus, the complete delivery time of the finish sets of solids control equipment can also be improved effectively.

2) shale shaker within stock for urgent task
We don’t have complete models shale shaker in share. We have main parts to get immediately assemble in commodity. And generally we need about a few days for the assembly. The particular assembly parts for shale shaker or mud cleaner or desander or desilter are the same. The stock parts can certainly improve the delivery rate inside a high efficiency.

GN decanter centrifuge

3) Decanter centrifuge in stock with regard to urgent project
GN Solids Control have over thirty sets decanter centrifuge inside stock for urgent undertaking requirement. Formerly, we stumble through centrifuge by orders. Plus the normal delivery time really should be about 30 days. But now, you could contact us for urgent job. And the delivery time typically can meet the requirements of the very most clients.

Except for stock within China facility, GN Solids Control also have some limbs in USA, Russia, Sydney, Argentina, UAE, Iran as well as Egypt. Our facility throughout USA already in operation for longer than 3 years, and we improve the sector there based the center. Our facility in Russian federation in operation for over 2 years and now we improve the market there in addition. For other places, we have a few agent for better assistance.

Meet GN solids control at oil exhibition 2016

If you would like to
meet GN solids control at oil exhibition in 2016, welcome to contact sales@gnsolidscontrol.com for the appointment.

For Asia, Middle east and other
countries around China, pls visit us at CIPPE 2016 in Beijing, China during
March 29~31th. We will show the most advanced solids control equipments and
drilling waste management equipments as below:

Cuttings disposal dryer with telescopic
skid

Drilling waste decanter centrifuge with
telescopic skid

Mining centrifuge

Hi-G dryer shaker

Cuttings solidification unit

Solids control shale shaker

Solids control mud cleaner

Shaker screens

Dewatering unit

We have a 272m2 booth at E2 hall,
because our factory is quite closed to the exhibition center, only 50 minuted
drive by car, so we take all of our main equipments there to show.

If you are quite busy in March, welcome
to visit us at SIPPE 2016 in Shanghai this November.

If China is too far from your countries,
like the clents from South America, North America, Middle east, Africa, welcome
to visit us at OTC 2016 in Houston, TX at the beginning of May. We have 2
stands there,

GN Booth No. 1:
Reliant Center 1652-A
GN Booth No. 2: Reliant Arena 9732

Our
professional sales engineer will show you the unique technology of our vertical
cuttings dryer
and VFD decanter centrifuge, and 4 –panel shale shaker.

Due
to the low oil price and slow oil industry, some clients cancelled the
international oil show visit plan, and will mainly focus on the professional
oil show in their own country. You can meet GN at the specific exhibition
below:

(1)     In India:

(2)     In Iran

(3)     In Russia

(4)     In Malaysia

(5)     In singapore:

(6)     In Canada

(7)     In Abu Dhabi

If you are convenient to meet us for any